You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan Sistem Interceptor di Kawasan Kali Item Mulai Dikerjakan
.
photo istimewa - Beritajakarta.id

PAL Jaya Constructs IPAL with Interceptor System in Kemayoran

Construction of wastewater treatment (IPAL) with interceptor system in Serdang, Kemayoran, Central Jakarta is targeted to complete by the end of October.

We construct it in two locations

PD. PAL Jaya President Director, Subekti said, construction has been started since last Saturday (9/21). This construction is a part of Regional Strategic Program (KSD) 2019.

"We construct it in two locations, Kemayoran Sub-district Office's yard and SDA Department's pump house on Jalan Delta, RW 07 Serdang," he informed, Monday (9/23).

Rp 68 Billion Prepared for MBBR IPAL Development at Krukut Pump House

PD. PAL Jaya Kali Item (Black River) Wastewater Treatment Pilot Project PPK, Johan Supandi expected, this pilot project can be accepted by public and it can be implemeted well in accordance with the provisions.

"Hopefully it can work well," he conveyed.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye950 personTP Moan Simanjuntak
  2. Second Pilkada 2024 Debate Theme Set, Don't Miss It

    access_time26-10-2024 remove_red_eye777 personAldi Geri Lumban Tobing
  3. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye643 personBudhi Firmansyah Surapati
  4. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  5. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye392 personTiyo Surya Sakti